Summary (English)

  • Two conservation workshops for pottery and mosaic took place at Stobi during June. Both projects are the result of the collaboration with the Balkan Heritage Foundation from Stara Zagora. The international participants from different countries were offered a basic training for conservation and documentation. 19 Roman vessels and parts of the mosaic from the Old Episcopal Basilica were conserved during the 15 days of the workshops.

    Four projects for the conservation of metal objects, glass, pottery and stone objects were realized simultaneously with the other aforementioned projects. They were financed through the Annual Program for 2013 of the Macedonian Ministry of Culture. The activities resulted in conservation and preservation of 42 metal artifacts including the iron lamellar armour comprised of 322 plates and fragments (discovered in 2009, in a second half of the 6th century context of the House with a Triclinium), 41 piece of architectural decoration, among which the biggest attention is attracted by the marble reliefs of two griffins (found in the “Casino” in 2005), 22 glass vessels from the 1992 and 1995 salvage campaign at the Western Necropolis and 84 ceramic vessels mostly found in 2011 in the pottery kiln from the 1st century AD below the mosaic in the House of Peristeria.

    The first stage of the project for the conservation and restoration of the mosaic from the Old Episcopal Basilica was realized during June, July and August. The mosaic was removed from the original position in 1991 and the old bedding was cleaned in 1992. In 2013, the conservators applied new lime mortar bedding to 72 pieces and affixed them on aluminum honey comb panels. The project was self-financed by NI Stobi.

    The initial phase of the project for Conservation, restoration and reconstruction of the eastern half of the ima cavea of the theatre began in October and lasted until the first days of December. The ruined parts of the radial walls, the second circular wall, as well as the vaults below the mortar bedding for the seats were conserved and reconstructed. The project was financed through the Ministry of Culture Annual Program.

Director

  • Silvana Blazevska - National Institution Stobi

Team

  • Biljana Jankulovska - NI Stobi
  • Djuliano Laucovski Vergovski
  • Dragan Vergovski Alpi
  • Mariana Filova - NI Stobi
  • Mishko Tutkovski - NI Stobi
  • Tome Filov
  • Toni Mihajlov
  • Trajce Nacev - Goce Delchev University, Shtip
  • Vladimir Simeonov
  • Angela Pencheva

Research Body

  • National Institution Stobi

Funding Body

  • Balkan Heritage Foundation
  • Ministry of Culture of Republic of Macedonia