Summary (English)
The excavations of this season were located at the area S18. It was excavated the monument number 6 and the area opposite to the entrance. The functionality of this area was difficult to be defined, thought it was considered the idea it might have been an altar.
It was observed the area around the building 10 that has a quadrangle shape. The observation showed that its northern part is cut through by a channel. The monument number 16 displays some uncertainties as the excavations were not concluded in the area. The excavations ended with a sondage in the area S16, where were discovered remains of a road, 6 m long and oriented to the east-west direction.
Director
- Sandro De Maria - Università degli Studi di Bologna, Dipartimento di archeologia
- Shpresa Gjongecaj - Albanian Institute of Archaeology
Team
- Belisa Muka - Instituti i Arkeologjisë Tiranë, Departamenti i Antikitetit (Albanian Institute of Archaeology, Department of Antiquity)
- Giuseppe Lepore - Università degli Studi di Bologna, Dipartimento di Archeologia
Research Body
- Instituti Arkeologjik Tiranë (Albanian Institute of Archaeology)
- Università degli Studi di Bologna
Funding Body
- Ministero degli Affari Esteri, Italia
Images
- No files have been added yet