Fasti Online Home | Switch To Fasti Archaeological Conservation | Survey
logo

Excavation

  • Hidroelektrana Krka
  • Promina
  •  
  • Croatia
  • Šibenik-Knin
  • Town of Šibenik

Tools

Credits

  • The Italian Database is the result of a collaboration between:

    MIBAC (Ministero per i Beni e le Attività Culturali - Direzione Generale per i Beni Archeologici),

    ICCD (Istituto Centrale per il Catalogo e la Documentazione) and

    AIAC (Associazione Internazionale di Archeologia Classica).

  • AIAC_logo logo

Monuments

Periods

  • No period data has been added yet

Season

    • The Krka hydroelectric power plant was built and started operating in August 1895. It is the first commercial hydropower plant in Europe and the second in the world, and was put into operation two days after the hydroelectric power plant at Niagara Falls. ... Read More
  • 1900 AD
  • 1895 AD
  • 1945 AD

Images

  • file_image[PDF]
  • file_image[PDF]
  • file_image[PDF]
  • file_image[PDF]
  • file_image[PDF]
  • file_image[PDF]